The wall, full sizeOne photo archive — home, services, gallery
Gallery · Labeled, always★ 5.0 · 39 Google reviews

Work, labeled as what it is.

Every image here carries its label — real 828 work or reference imagery. Kenny's full photo archive is in: the sets below are real 8:28 projects, photographed on the job, before and after labeled in the frame. What little reference imagery remains sits only where no real photo exists yet — and it says so.

The film — her advice, in her words

Hire Kenny, she says

8:28 · Her recommendation — scroll plays the film
Her advice, in her words

Asked what she would tell future customers of 8:28 Construction Group, she does not hesitate.

“Absolutely without a doubt”

Her words, as she says them — the captions on this clip are the film's own.

“Hire Kenny.”

The whole film — all 81 seconds, with sound — plays on the home page, in the film section.

Her advice to future customers, in her own words — filmed in the finished basement in the sets below.

Eight seconds of the film, played by your scroll — her recommendation, with the film's own captions. The whole film plays on the home page — and the work behind every set on this page is Kenny's own, photographed on site.

Featured — a real before & after

Kitchen renovation — grey shaker · Real 828 work

Before — Kitchen renovation — grey shaker, as found
After — Kitchen renovation — grey shaker, finished
BeforeAfter

The same basement, before and after its finish — a raw concrete shell on one side, the finished room with its wet bar and powder room on the other. Real 828 photos from Kenny's own job archive. This pair also drives the scroll sequence on the home page.

Remodeling

27 entries · every photo labeled in its frame

Finished basement media room — LVP flooring, recliner row, wall-mounted TV
North Coventry basementReal 828 work
After — the wet bar — dark cabinets, butcher-block island
Finished basementAfterReal 828 work
After — the finished living room and its linear fireplace
Finished basementAfterReal 828 work
Before — the same basement's window wall as a raw concrete shell
Finished basementBeforeReal 828 work
Before — the utility wall, raw concrete with the panel and pipe runs
Finished basementBeforeReal 828 work
After — the living area from the stairs
Finished basementAfterReal 828 work
After — the new powder room
Finished basementAfterReal 828 work
After — the carpet side, looking back to the bar
Finished basementAfterReal 828 work
Before — the shell from the utility corner
Finished basementBeforeReal 828 work
Primary bedroom after the refresh — wood-look flooring and taupe walls
Bedroom refreshReal 828 work
Primary bedroom before the refresh — beige carpet and pale walls
Bedroom refreshReal 828 work
After — the primary bathroom — white shaker vanity, new flooring
Bedroom refreshAfterReal 828 work
Before — the primary bathroom before — oak vanity, sheet vinyl
Bedroom refreshBeforeReal 828 work
After — the bathroom refreshed — navy vanity
Bedroom refreshAfterReal 828 work
Before — the bathroom before — oak vanity, carpet runner
Bedroom refreshBeforeReal 828 work
After — the upstairs hall in new LVP
Bedroom refreshAfterReal 828 work
Before — the upstairs hall in carpet, before
Bedroom refreshBeforeReal 828 work
After — the staircase — LVP treads
Bedroom refreshAfterReal 828 work
Before — the staircase before — worn carpet
Bedroom refreshBeforeReal 828 work
After — the staircase from below — patterned treads, painted risers
Bedroom refreshAfterReal 828 work
After — the laundry room, refreshed
Bedroom refreshAfterReal 828 work
Before — the laundry room before
Bedroom refreshBeforeReal 828 work
Second bedroom after the refresh — grey walls and carpet, sports-themed décor
Bedroom refreshReal 828 work
After — the renovated master bath down its long axis
Master bathroom renovationAfterReal 828 work
Before — the same room before — sage walls, corner tub
Master bathroom renovationBeforeReal 828 work
After — the glass shower with its bench seat
Master bathroom renovationAfterReal 828 work
After — from the water closet toward the arched windows
Master bathroom renovationAfterReal 828 work
After — the double vanity
Master bathroom renovationAfterReal 828 work
Before — the corner jetted tub, before
Master bathroom renovationBeforeReal 828 work
After — the suite living room — stone wall, refinished floors
In-law suiteAfterReal 828 work
Before — the same living room before
In-law suiteBeforeReal 828 work
After — the suite kitchen
In-law suiteAfterReal 828 work
After — the suite bathroom
In-law suiteAfterReal 828 work
After — the bedroom with its stone accent wall
In-law suiteAfterReal 828 work
After — the kitchen run
In-law suiteAfterReal 828 work
Before — the foyer before
In-law suiteBeforeReal 828 work
After — grey shaker cabinets, glass uppers, new counters
Kitchen renovationAfterReal 828 work
Before — the same kitchen in honey oak
Kitchen renovationBeforeReal 828 work
After — down the long run
Kitchen renovationAfterReal 828 work
After — from the dining side
Kitchen renovationAfterReal 828 work
Before — the oak kitchen before, reverse angle
Kitchen renovationBeforeReal 828 work
After — white cabinets and LVP in the galley
Kitchen renovationAfterReal 828 work
Before — the galley before — tile floor, mixed cabinets
Kitchen renovationBeforeReal 828 work
After — the sink wall with under-cabinet light
Kitchen renovationAfterReal 828 work
Before — the galley before, from the door
Kitchen renovationBeforeReal 828 work
After — the expanded bath — glass shower, sage vanity
Bathroom expansion & renovationAfterReal 828 work
Before — the small bath before, taped for layout
Bathroom expansion & renovationBeforeReal 828 work
After — the pebble-floor shower
Bathroom expansion & renovationAfterReal 828 work
After — from the doorway
Bathroom expansion & renovationAfterReal 828 work
Before — the vanity wall before
Bathroom expansion & renovationBeforeReal 828 work
After — marble-look tub surround and new tile floor
Bathroom renovationAfterReal 828 work
Before — the tub and shower before
Bathroom renovationBeforeReal 828 work
After — the navy vanity
Bathroom renovationAfterReal 828 work
After — the water closet
Bathroom renovationAfterReal 828 work
Before — the vanity before
Bathroom renovationBeforeReal 828 work
After — the black-tile glass shower
Bathroom renoAfterReal 828 work
Before — the harvest-gold tub before
Bathroom renoBeforeReal 828 work
After — the full room — coffered ceiling, LVP
Bathroom renoAfterReal 828 work
After — the vanity and oval mirror
Bathroom renoAfterReal 828 work
Before — the room before, from the door
Bathroom renoBeforeReal 828 work
After — the new powder room through its pocket door
Powder room installationAfterReal 828 work
Before — the family room before — tape marks the powder-room footprint
Powder room installationBeforeReal 828 work
After — the powder-room vanity under the octagon window
Powder room installationAfterReal 828 work
After — wainscoting and the desk wall
Powder room installationAfterReal 828 work
After — the hall, finished
Powder room installationAfterReal 828 work
After — grey vanity and sliding barn door
Basement bathroomAfterReal 828 work
After — the marble-look glass shower
Basement bathroomAfterReal 828 work
After — the water closet with built-in shelves
Basement bathroomAfterReal 828 work
After — the marble-look shower conversion
Low-budget bathroom renovationAfterReal 828 work
Before — the tub before — measuring for the conversion
Low-budget bathroom renovationBeforeReal 828 work
After — patterned tile, built-ins, side-by-side machines
Laundry room makeoverAfterReal 828 work
Before — the cluttered work counter before
Laundry room makeoverBeforeReal 828 work
After — the sage built-in cabinetry
Laundry room makeoverAfterReal 828 work
After — the mudroom bench run
Laundry room makeoverAfterReal 828 work
After — the machines from the door
Laundry room makeoverAfterReal 828 work
Before — the stacked laundry unit before
Laundry room makeoverBeforeReal 828 work
After — the finished stone backsplash over granite
Kitchen backsplashAfterReal 828 work
Before — the range wall before
Kitchen backsplashBeforeReal 828 work
After — the sink run, finished
Kitchen backsplashAfterReal 828 work
Before — the range wall before, wider
Kitchen backsplashBeforeReal 828 work
After — white shaker cabinets, subway tile, dark stone counters
Kitchen backsplashAfterReal 828 work
After — the range corner
Kitchen backsplashAfterReal 828 work
After — the farmhouse sink run
Kitchen backsplashAfterReal 828 work
After — the loft — new carpet, fresh paint
Whole-house refreshAfterReal 828 work
Before — the loft before — worn boards, tired paint
Whole-house refreshBeforeReal 828 work
After — the kitchen — grey cabinets, subway backsplash
Whole-house refreshAfterReal 828 work
After — the living room in new LVP
Whole-house refreshAfterReal 828 work
After — the staircase, refinished
Whole-house refreshAfterReal 828 work
Before — the kitchen floor before — down to subfloor
Whole-house refreshBeforeReal 828 work
After — grey-wash LVP through the rec room
LVP installAfterReal 828 work
Before — the carpeted rec room before
LVP installBeforeReal 828 work
After — the gym side
LVP installAfterReal 828 work
After — the stairs in LVP
LVP installAfterReal 828 work
Before — the carpeted stairs before
LVP installBeforeReal 828 work
After — warm LVP through the living room
LVP install & kitchen backsplashAfterReal 828 work
Before — the carpeted living room before
LVP install & kitchen backsplashBeforeReal 828 work
After — the kitchen — island and subway backsplash
LVP install & kitchen backsplashAfterReal 828 work
After — the entry hall in new LVP
LVP install & kitchen backsplashAfterReal 828 work
Before — the mixed floors before
LVP install & kitchen backsplashBeforeReal 828 work
After — LVP stair treads, white risers
LVP installAfterReal 828 work
Before — the carpeted stairs before
LVP installBeforeReal 828 work
After — the upstairs hall in LVP
LVP installAfterReal 828 work
After — rich-brown LVP through the lobby
LVP installAfterReal 828 work
Before — the carpeted hall before
LVP installBeforeReal 828 work
After — the ramp landing
LVP installAfterReal 828 work
After — the side room, paint in progress
LVP installAfterReal 828 work
After — warm-white paint and cherry-tone LVP
Paint & LVPAfterReal 828 work
Before — the mint-green basement before
Paint & LVPBeforeReal 828 work
After — the room from the stairs
Paint & LVPAfterReal 828 work
After — the stairs, refinished
Paint & LVPAfterReal 828 work
Before — the carpeted stairs before
Paint & LVPBeforeReal 828 work
After — the lower level in new LVP
Drywall, trim, paint & LVPAfterReal 828 work
Before — the cluttered, carpeted room before
Drywall, trim, paint & LVPBeforeReal 828 work
After — the pantry, trimmed out
Drywall, trim, paint & LVPAfterReal 828 work
After — the stairs — LVP treads, black rail
Drywall, trim, paint & LVPAfterReal 828 work
Before — the pantry mid-work
Drywall, trim, paint & LVPBeforeReal 828 work
After — the bedroom in LVP and pale blue
Drywall repair, paint & LVPAfterReal 828 work
Before — the carpeted bedroom before
Drywall repair, paint & LVPBeforeReal 828 work
After — from the door
Drywall repair, paint & LVPAfterReal 828 work
After — the closet in LVP
Drywall repair, paint & LVPAfterReal 828 work
Before — the bed wall before
Drywall repair, paint & LVPBeforeReal 828 work
After — drywall hung and finished in the loft space
DrywallAfterReal 828 work
Before — the same space at framing
DrywallBeforeReal 828 work
After — the window room, boarded
DrywallAfterReal 828 work
After — the long room in finished board
DrywallAfterReal 828 work
Before — framing, reverse angle
DrywallBeforeReal 828 work
After — the bedroom repainted in teal after the repair
Structural repair, insulation, drywall & paintAfterReal 828 work
Before — the room before — deep blue walls
Structural repair, insulation, drywall & paintBeforeReal 828 work
Cabinetry installation in progress
Craftsman kitchenReference imagery
Finished stone and brass detail
Craftsman kitchenReference imagery

Excavation

1 entry · every photo labeled in its frame

Excavation and sitework in progress — reference imagery
Excavation siteworkReference imagery

Concrete

1 entry · every photo labeled in its frame

Blueprint diagram of a formed concrete pour — diagram art
Concrete flatworkReference imagery

Lateral replacement

1 entry · every photo labeled in its frame

Blueprint cross-section of a sewer lateral from house to street main — diagram art
Lateral replacementReference imagery

Every review on this site is a published Google review, word for word. Every photo is labeled — real 828 work or reference imagery. Nothing in between. Project photos: Kenny's own job photos, taken on the job and labeled set by set.

Your project, next

Start with a consult.

A free 90-minute in-home walkthrough — scope, constraints, and honest next steps from Kenny himself.