From mid five figures
Refresh
- Cabinet refinish or face-frame refresh
- New counters & backsplash
- Lighting & faucet upgrade
Kitchen remodeling
We rebuild kitchens around workflow, light, and storage — with cabinetry, surfaces, and electrical coordinated before the first wall opens.
In scope
Engagement levels
From mid five figures
Custom scoped
Design-led
Homeowners on this work
5.0 · 39 Google reviews, every one 5 stars
“Whether it be bathrooms, kitchens or basements, these guys should be at the top of the list of contractors to talk to. Committed to the highest standards of excellence.”
“They finished our attic space and it turned out so good. The whole team was super professional and respectful of our time and space.”
FAQ
Most full kitchens run 6–12 weeks on site after selections lock. Partial refreshes can be faster; structural moves extend the schedule.
Yes. After design and walkthrough we issue a fixed-scope proposal so change orders are the exception, not the business model.
Often yes with a temporary kitchen plan. We map dust, access, and daily workflow before demo day.